When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
Yes down pipes are done. Went with some 3".
The intercooler is designed and started building it.
Massive 17x6x4.5 air/water build.
Everything stays in the engine bay.
Nothing esle to show right now. The intercooler is going to be next. Then figure out were to put the gates. things are starting to get a little tight in there.