Magnacharger/nitrous
#21
Thread Starter
Former Vendor
iTrader: (1)
Joined: Jul 2004
Posts: 2,801
Likes: 0
From: Wichita Falls, TX
Originally Posted by j's01silverado
How long do you think something like this would take? Approx. cost?
Cost for the system not sure have to find out how large the piece will be, and what aluminum is costing at the time of builid them.
Ricky
Ricky
#22
Originally Posted by NXRICKY
Timeline to draw, and build 1st part 2-3 weeks. Depending mostly on the shops time line. 1st week will be spent mainly drawing the part out, and checking to fitment prior to making the first artical.
Cost for the system not sure have to find out how large the piece will be, and what aluminum is costing at the time of builid them.
Ricky
Ricky
Cost for the system not sure have to find out how large the piece will be, and what aluminum is costing at the time of builid them.
Ricky
Ricky
#24
Thread Starter
Former Vendor
iTrader: (1)
Joined: Jul 2004
Posts: 2,801
Likes: 0
From: Wichita Falls, TX
Originally Posted by BlownChevy
yeah keep us posted....I cant wait! MMMMMM 50 shot.
I will keep yall post. I hope to have a something in hand to start with next week.
Ricky