PROJECTS GALLERY Vehicle builds | Engine Swaps | Conversions | Installation write ups |

My large frame front mount project with two videos

Thread Tools
 
Search this Thread
 
Old 02-07-2009, 09:07 PM
  #61  
How do I change this text
Thread Starter
iTrader: (26)
 
Wilde Racing's Avatar
 
Join Date: Jan 2005
Location: Behind the TIG welder
Posts: 7,294
Likes: 0
Received 2 Likes on 2 Posts
Default

It's a S475 Budget unit...
Old 02-08-2009, 03:57 PM
  #62  
something else
iTrader: (39)
 
ChevyTruck's Avatar
 
Join Date: Jun 2008
Location: Newark, DE
Posts: 3,726
Likes: 0
Received 1 Like on 1 Post
Default

Any updates?
Old 02-08-2009, 04:04 PM
  #63  
How do I change this text
Thread Starter
iTrader: (26)
 
Wilde Racing's Avatar
 
Join Date: Jan 2005
Location: Behind the TIG welder
Posts: 7,294
Likes: 0
Received 2 Likes on 2 Posts
Default

I got the oil cooler some-what mounted...
Old 02-08-2009, 04:15 PM
  #64  
TECH Veteran
iTrader: (1)
 
vanillagorilla's Avatar
 
Join Date: Apr 2004
Location: Arizona Bay
Posts: 4,038
Likes: 0
Received 0 Likes on 0 Posts
Default

You should prepare to move the A/C accumulator tank...or at least ditch it. That is if you've got the sand to run a full 5" DP all the way back.
Old 02-08-2009, 04:36 PM
  #65  
formerly 2004RST (changed 11/19/2012)
iTrader: (8)
 
OneQwikSS's Avatar
 
Join Date: Nov 2007
Location: Spring Hill, FL
Posts: 1,275
Received 1 Like on 1 Post
Default

she gon' be purty love to see front mounts on gas engines in trucks...all variables considered...our trucks kick ***
Old 02-08-2009, 04:58 PM
  #66  
How do I change this text
Thread Starter
iTrader: (26)
 
Wilde Racing's Avatar
 
Join Date: Jan 2005
Location: Behind the TIG welder
Posts: 7,294
Likes: 0
Received 2 Likes on 2 Posts
Default

Originally Posted by vanillagorilla
You should prepare to move the A/C accumulator tank...or at least ditch it. That is if you've got the sand to run a full 5" DP all the way back.
The plan is to try to run the 5 inch down pipe down, then a 3 inch cutout. Then run as far back as I can with the 5 inch. I'll have to clearance a lot of sections with a hammer. The a/c accumulator will be one spot I'll have to make some room.
Old 02-08-2009, 05:03 PM
  #67  
TECH Fanatic
iTrader: (4)
 
OnyxSilveradoSS's Avatar
 
Join Date: Dec 2003
Location: Detroit
Posts: 1,069
Likes: 0
Received 0 Likes on 0 Posts
Default

what exactly is budget$$?
Old 02-08-2009, 08:29 PM
  #68  
Adkoonerstrator
iTrader: (4)
 
XLR8NSS's Avatar
 
Join Date: Nov 2001
Location: Deep in the seedy underworld of Koonerville
Posts: 21,436
Likes: 0
Received 3 Likes on 2 Posts
Default

I love this picture!



How are you planning on bringing split tubes into the turbo and still having room to run a 5" downpipe?
Old 02-08-2009, 08:35 PM
  #69  
2nd fastest 5.3 ECSB
iTrader: (14)
 
trever1t's Avatar
 
Join Date: Oct 2005
Location: NorCal
Posts: 26,690
Likes: 0
Received 1 Like on 1 Post
Default

Originally Posted by XLR8NSS

How are you planning on bringing split tubes into the turbo and still having room to run a 5" downpipe?
you want him to brave reality...now? lol, love the chain holding that monster up!
Old 02-08-2009, 08:46 PM
  #70  
How do I change this text
Thread Starter
iTrader: (26)
 
Wilde Racing's Avatar
 
Join Date: Jan 2005
Location: Behind the TIG welder
Posts: 7,294
Likes: 0
Received 2 Likes on 2 Posts
Default

Originally Posted by trever1t
you want him to brave reality...now? lol, love the chain holding that monster up!
LMAO, yea it might be a pipe dream... We'll see... I think I can but I have a few issues, I only have one 38mm waste gate, and I'd like to be able to remove the spark plugs some day... One thing is for sure... A hammer will be required to make the 5 inch fit...


Quick Reply: My large frame front mount project with two videos



All times are GMT -5. The time now is 04:11 AM.